SP166 Steel Metal Plate Warehouse Storage Materials Mezzanine Floor System

Customization: Available
Characteristics Of Goods: /
Type: Heavy Section Steel

Product Description

Overview & Basic Info

Model NO.:
SP166
Shipment:
by Container or Bulk Vessel
Standard:
GB, ASTM
Application:
Steel Workshop, Steel Structure Platform
Forming:
Hot rolled steel or cold drawn steel
Carbon Structural Steel:
Metal, Steel, Q195, Q235, Q355
Production Capacity:
5000 Ton Per Month
Connection Form:
Bolt, Welded, or Rivet connection

Product Parameters

Product NameSP166 Steel Metal Plate Mezzanine Floor System
FinishPowder coated, Hot dipped galvanized, Painted
CertificationISO9001:2015, ISO14000:2018, ISO45001:2018
Surface TreatmentPhosphorization
Weight Capacity500-1500 kgs/square meter
Loading Capacity200-1000 kgs/square meter
Welding TechnologySingle level butt welding, fillet welding, Gas shielded welding
UsageOffice, Industrial, Warehouse Storage
DeliveryWithin 30-40 days after deposit

Detailed Photos

Mezzanine Floor System Detail 1
Mezzanine Floor System Detail 2
Mezzanine Floor System Detail 3

Key Features & Capabilities

  • 20 years experience in steel and sheet metal fabrication
  • Advanced precision machinery for high-quality output
  • Reliable reputation in international business standards
  • Professional engineering team to turn designs into reality
Process Header
Production Process 1
Production Process 2
Production Process 3
Production Process 4
Workshop View

Frequently Asked Questions

Are you a trading company or manufacturer?
We have our own specialized factory for steel fabrication located in China.
What is your minimum order quantity (MOQ)?
For trial orders, a minimum of one set is acceptable.
What are your terms of payment?
We require 30%-50% T/T for deposit, with the remaining balance due before loading.
What after-sale services do you provide?
Upon delivery, we provide detailed drawings, installation instructions, and a packing list. Our team is available to assist with any installation issues.
What is the typical delivery time?
Delivery generally takes 30-40 days after receipt of deposit, depending on the order quantity and customization requirements.
What is the loading capacity of the mezzanine floor?
The system supports a loading capacity ranging from 200kg to 1000kg per square meter, depending on the specific design.

Related Products