Custom Lab Layout with GMP and Safety Standard Cleanroom

Still deciding? Get samples of $ !
Order Sample

Product Description

i

Basic Specifications

Model NO.
SHPCR-1
Certification
CE, ISO9001
Noise Level
40-60db
Application
Industrial
Control Mode
Touch Control
Product Name
Pharmaceutical Cleanroom
Design Type
Modular Designs
Main Function
Clean Work Room
Material
Stainless Steel SUS304/201/Q195 / Galvanized Sheet
Size
Customized Size
HEPA Filter
99.99% @ 0.3um
Production Capacity
500,000 PC/Year
Origin
China
HS Code
94069090
P

Packaging & Delivery

Package Size
1.00cm * 1.00cm * 1.00cm
Gross Weight
1.000kg
Transport Package
Wooden Case
Specification
Custom
D

Product Description

A clean room is a specially designed environment engineered to exclude airborne particles, bacteria, and other harmful pollutants. It maintains precise control over indoor temperature, cleanliness, interior pressure, air velocity, air distribution, noise, vibration, lighting, and static electricity. Regardless of how external air conditions fluctuate, the interior consistently meets specific requirements for cleanliness, temperature, humidity, and pressure performance.

The primary function of a clean room is to regulate the environment where sensitive products (such as silicon) are manufactured. According to international standards, purification levels are determined by the concentration of particles per cubic meter. Achieving a "dust-free" environment doesn't mean zero particles, but rather controlling them to extremely minute levels. For optical and high-precision manufacturing, even a single speck of dust can have a significant negative impact, making a controlled clean room environment an essential requirement.

Cleanroom Standard Divider
?

Frequently Asked Questions

Are you a manufacturer and what products do you offer?
We are a manufacturer focusing on full cleanroom projects, including air showers, FFU, pass boxes, dispensing booths, Laminar air flow hoods/benches, AHU, and hermetic doors and windows.
What is the standard lead time for orders?
For complete cleanroom projects including AHU, the lead time is approximately 35 days. For equipment orders without AHU, the lead time is roughly 10 days.
What is your warranty policy and after-sales support?
We provide a 2-year warranty from the date of project completion. During this period, we will replace any problematic components. If a technical issue cannot be handled locally, we provide engineering support to resolve it.
Can you provide cleanroom validation documentation?
Yes, we provide a comprehensive documentation suite including DQ, IQ, OQ, PQ, as well as FAT & SAT. We also provide product operation manuals, maintenance guidance, and full sets of cleanroom drawings.
What are your technical advantages?
We have a professional technical team of 12 senior cleanroom & HVAC engineers. With experience spanning over 2,100 cleanroom projects globally across various countries, we offer robust technical support and proven expertise.

Related Products